| AbouRizk, S.M., S.R. Mandalapu and M.
Skibniewski, |
1994 |
"Analysis and Evaluation of Alternative
Technologies", Journal of Management in Engineering May/June,
65-71. |
| Abulfarej, W.H., |
1994 |
"Special concrete shield selection using the
analytic hierarchy process", Nuclear Technology, Vol. 107, No. 2, pp.
215-226. |
| Accola, W.L., |
1992 |
"An Empirical Investigation of the Effects
of a Capital Budgeting Computerized Decision Aid and Cognitive Style
Differences on Investment Decisions", University of Kentucky, DAI-A 53/04,
p. 1205. |
| Aczel, J. and C. Alsina, |
1987 |
"Synthesizing Judgments: a Functional
Equations Approach," Mathematical Modelling 9/3-5, 311-320. |
| Aczel, J. and C. Alsina, |
1986 |
"On Synthesis of Judgments", Socio-Economic
Planning Sciences 20/6, pp. 333-339. |
| Aczel, J. and T.L. Saaty, |
1983 |
"Procedures for Synthesizing Ratio
Judgments," Journal of Mathematical Psychology 27, 93-102. |
| Aczel, Janos, Fred S. Roberts, |
1989 |
"On the possible merging functions",
Mathematical Social Sciences 17, 205-243.A |
| Aggarwal, K.K., and Y. Singh, |
1995 |
"Software reliability apportionment using
the analytic hierarchy process", SIGSOFT Software Engineering Note, Vol.
20, No. 5, pp. 56-61. |
| Aladyev,V. Z., |
1988 |
" Survey on some Theoretical Results and
Applicability Aspects in Parallel Computation Modeling", J. New Gener.
Comput. Syst. 1. |
| Alamgir, K.M. and Tabucanon, |
1995 |
"Batch-model assembly line balancing: A
multiattribute decision making approach", International Journal of
Production Economics Vol. 41, No. 1-3, pp. 193-201. |
| Al-Awadi, M.A., |
1989 |
"The Use of the Analytical Hierarchy Process
in Conflict Analysis: Application to the Iraq-Iran War", The George
Washington University, DAI-A 50/05, p. 1360. |
| Alexander, H.R., J. Biggers, E. Forman, D.
Schleicher, |
1994 |
" Prioritization of Civil Tiltrotor
Technologies Using the Analytic Hierarchy Process", Presented at the Third
International Symposium on the Analytic Hierarchy Process, George
Washington University, Washington DC, July 11-13. |
| Alexander, J. and T.L. Saaty, |
1977 |
"The Forward and Backward Process of
Conflict Analysis", Behavioral Science 22, 87-98. |
| Alexander, J. and T.L. Saaty, |
1977 |
"Stability Analysis of the Forward-Backward
Process", Behavioral Science 22, 375-392. |
| Alexander, J.M., |
1989 |
"An Analysis of Conflict in Northern
Ireland", in: B.L. Golden, E.A. Wasil and P.T. Harker (eds), The Analytic
Hierarchy Process, Springer-Verlag, New York, 225-241. |
| Alexander, J.M., |
1983 |
"Priorities and Preferences in Conflict
Resolution", Mathematics and Computers in Simulation 25/2,
108-119. |
| Alexander, J.M., |
1982 |
"Priorities and Preferences in Northern
Ireland: An Update", Proceedings of the 10th IMACS World Congress on
System Simulation and Scientific Computation, Montreal, Canada,
308-310. |
| Alexander, Joyce, |
1994 |
" The Analytic Hierarchy Process and the
Development of Mathematical Thinning", Presented at the Third
International Symposium on the Analytic Hierarchy Process, Washington DC,
July 11-13. |
| Algie, J., G. Mallen and W.
Foster, |
1983 |
"Financial Cutback Decisions by Priority
Scaling", Journal of Management Studies 20/2, 233-260. |
| Alho, J.M. and J. Kangas |
1997 |
"Analyzing Uncertainties in Experts'
Opinions of Forest Plan Performance", Forest Science, Vol. 43, No. 4, Nov.
1997, 521-528. |
| Alho, J.M., J. Kangas, and O. Kolehmainen, |
1994 |
"Uncertainty in the Expert Predictions of the Ecological
Consequences of Forest Plans", Working Paper, University of Jeonsuu,
Finland. |
| Alidi, A.S., |
1996 |
"Use of the analytic hierarchy process to
measure the initial viability of industrial projects", International
Journal of Project Management, Vol. 14, No. 4, pp. 205-208. |
| Allen, T.R., |
1986 |
"Using Decision Analysis in Physical
Protection Planning", Nuclear Materials Management 15,
251-255. |
| Al-Tassan, A.M., |
1987 |
"An Analytic and Evaluation Study of
Government Employee Housing Programs in Saudi Arabia: Using the Analytic
Hierarchy Process", The University of Michigan, DAI-A 47/10, p.
3591. |
| Amin, H.A., |
1985 |
"Evaluating the Appropriateness of
Microcomputers for Litigation Document Management Using the Analytic
Hierarchy Process", The George Washington University, DAI-A 45/10, p.
3018. |
| Anderson, D, D. Sweeney, and T.
Williams, |
1986 |
"Decision Analysis With Multiple Criteria",
Quantitative Methods for Business, West Publishing, 3rd
ed. |
| Anderson, D.R., D.J. Sweeney and T.A.
Williams (eds.), |
1992 |
"The Analytic Hierarchy Process", in: ch.
18, Quantitative Methods for Business (5th Ed.), West Publishing,
763-775. |
| Anderson, David, Dennis Sweeney, and Thomas
Williams, |
1980 |
"Decision Analysis with Multiple Criteria",
Quantitative Methods for Business, Chapter 5. |
| Anderson, Richard, Richard
Scotti, |
1996 |
" Montgomery County Capital Project Site
Selection Process Improvement: A system Analysis", Presented at the Annual
meeting of the (INFORMS), Washington DC, May 5. |
| Apostolou, B. and N. Apostolou, |
1991 |
"Managerial Evaluation of the Internal
Control Structure", Research in Accounting Regulation 5,
121-43. |
| Apostolou, B., J.M. Beehler and J.M.
Hassell, |
1993 |
"The 20-factor Worker Status Test: Would
Seven Factors Work Just as Well?", Tax Notes, December, 1-9. |
| Apostolou, B., R.M. Harper and J.R.
Strawser, |
1990 |
"Reliance on Internal Audit Departments",
Managerial Auditing Journal 5/3, 3-9. |
| Apostolou, B.A. and J.M. Hassell, |
1993 |
"An Empirical Examination of the Sensitivity
of the Analytic Hierarchy Process to Departures from Recommended
Consistency Ratios", Mathematical and Computer Modelling 17/4-5,
163-170. |
| Apostolou, B.A. and J.M. Hassell, |
1993 |
"An Overview of the Analytic Hierarchy
Process and its Use in Accounting Research", Journal of Accounting
Literature 12, 1-28. |
| Apostolou, B.A., |
1989 |
"An Investigation of Internal Auditor
Judgment on the Importance of Indicators of Potential financial Fraud: An
Analytic Hierarchy Process Approach", DAI-A 49/12, 3779. |
| Arbel A. and L.G. Vargas, |
1993 |
"Preference Programming and Preference
Simulation: Robustness Issues in the AHP," European Journal of Operational
Research (To Appear). |
| Arbel, A. and A. Seidmann, |
1985 |
"Designing a Multimicro Distributed
Accounting Information System", Human Systems Management (Netherlands)
5/4, 283-91. |
| Arbel, A. and A. Seidmann, |
1985 |
"Capacity Planning, Benchmarking and
Evaluation of Small Computer Systems", European Journal of Operational
Research 22/3, 347-358. |
| Arbel, A. and A. Seidmann, |
1984 |
"Selecting a Microcomputer for Process
Control and Data Acquisition", IIE Transactions 16/1, 73-80. |
| Arbel, A. and A. Seidmann, |
1984 |
"Performance Evaluation of Flexible
Manufacturing Systems", IEEE Transactions on Systems, Man and Cybernetics
SMC/14/4, 606-617. |
| Arbel, A. and A. Seidmann, |
1982 |
"Selecting an FMS: A Decision Framework",
Department of Industrial Engineering, Tel-Aviv University,
Israel. |
| Arbel, A. and L.G. Vargas, |
1992 |
"The Analytic Hierarchy Process with
Interval Judgments", in: A. Goicechea, L. Duckstein and S. Zionts (eds.)
Multiple Criteria Decision Making, Springer-Verlag, 61-70. |
| Arbel, A. and N. Novik, |
1985 |
"U.S. Pressure on Israel - Likelihood and
Scope", Journal of Conflict Resolution 29/2, 253-282. |
| Arbel, A. and R.M. Tong, |
1982 |
"On the Generation of Alternatives in
Decision Analysis Problems", OR: The Journal of the Operational Research
Society 33/4, 377-387. |
| Arbel, A. and S.S. Oren, |
1986 |
"Generating Search Directions in
Multiobjective Linear Programming Using the Analytic Hierarchy Process",
Socio-Economic Planning Sciences 20/6, 369-373. |
| Arbel, A. and Y. Shypira, |
1986 |
"A Decision Framework for Evaluating Vacuum
Pumping Technology", J. Vac. Sci. Technol. , A 4(2), 230-236. |
| Arbel, A. and Y.E. Orgler, |
1990 |
"An Application of the AHP to Bank Strategic
Planning: The Mergers and Acquisitions Process", European Journal of
Operational Research 48/1, 27-37. |
| Arbel, A., |
1993 |
"A Weighted-Gradient Approach to
Multiobjective Linear Programming Problems Using the Analytic Hierarchy
Process", Mathematical and Computer Modelling 17/4-5, 27-40. |
| Arbel, A., |
1991 |
"A Linear Programming Approach for
Processing Approximation Articulation of Preference", Collection: Multiple
Criteria Decision Support (Helsinki, 1989), 79-86. |
| Arbel, A., |
1989 |
"Approximate Articulation of Preference and
Priority Derivation," European Journal of Operational Research 43/3,
317-326. |
| Arbel, A., |
1987 |
"Venturing Into New Technological Markets,"
Mathematical Modelling 9/3-5, 293-298. |
| Arbel, A., |
1983 |
"A University Budget Problem: A Priority
Based Approach", Socio-Economic Planning Sciences 17/4,
181-189. |
| Arbel, A., J.R. Payne and R.M.
Tong, |
1981 |
"Decision Aids Derived from HARPOON/TOMAHAWK
Targeting Considerations", Advanced Information and Decision Systems,
Mountain View, CA. |
| Arbel, A., T.L. Saaty and L.G.
Vargas, |
1987 |
"Nuclear Balance and the Parity Index: The
Role of Intangibles in Decisions," IEEE Transactions in Systems, Man and
Cybernetics, September. |
| Armacost, R.L. and J.C. Hosseini, |
1994 |
"Identification of Determinant Attributes
Using the Analytic Hierarchy Process", Journal of the Academy of Marketing
Science 22/4, 383-392. |
| Armacost, R.L., J.C. Hosseini and R.G.
Javalgi, |
1990 |
"Using the Analytic Hierarchy Process for
Small Business Decision Making", Akron Business & Economic Review
21/1, 75-89. |
| Armacost, R.L., P.J. Componation, M.A.
Mullens, and W.W. Swart, |
1994 |
"An AHP framework for prioritizing customer
requirements in QFD: An industrialized housing application", IIE
Transactions, Vol. 26, No. 4, p. 72-79. |
| Arrington, C.E., R.E. Jensen and M.
Tokutani, |
1982 |
"Scaling of Corporate Multivariate
Performance Criteria: Subjective Composition Versus the Analytic Hierarchy
Process", Journal of Accounting and Public Policy 1/2,
95-123. |
| Arrington, C.E., W. Hillison and R.E.
Jensen, |
1984 |
"An Application of Analytical Hierarchy
Process to Model Expert Judgments on Analytical Review Procedures",
Journal of Accounting Research 22/1, 298-312. |
| Asahi, T., D. Turo, and B.
Shneiderman, |
1995 |
"Using tree maps to visualize the analytic
hierarchy process", Information Systems Research, Vol. 8, No. 4, p.
357 |
| Aupetit, B. and C. Genest, |
1993 |
"On Some Useful Properties of the Perron
Eigenvalue of a Positive Reciprocal Matrix in the Context of the Analytic
Hierarchy Process", European J. of Operational Research 67, in
press. |
| Austin, J.S., R.N. Braswell, J. Ostrominski
and C.R. White, |
1983 |
"Productivity Measurement: An Analytic
Approach", Leadership and Management Development Center, Maxwell AFB,
AL. |
| Avenhaus, R., |
1981 |
"Game Theoretic Analysis of Inventory
Verification", Mathematical and Statistical Methods in Nuclear Safeguards,
Lectures from Joint Research Centre, Ispra (Italy),317. |
| Azani, H., and R. Khorramshahgol, |
1990 |
"Analytic delphi method: A strategic
decision making model applied to location planning", Engineering Costs and
Production Economics, Vol. 20, No. 1, pp. 23-28. |
| Azis Iwan J., |
1994 |
" Tensional and conflict in the future path
of the global economic and trading system: An AHP overture", Prepared for
the AHP Workshop conducted at the University of Pitt.,
December. |
| Azis, I.J., |
1996 |
"Resolving Possible Tensions in ASEAN's
future trade using analytic hierarchy process", Asean Economic Bulletin,
Vol. 12, No. 33, p. 309. |
| Azis, Iwan J., |
1996 |
"Reciting trade conflicts using analytic
hierarchy process", Proceedings of the Fourth International Symposium on
the Analytic Hierarchy Process, Simon Frasier University, Burnaby, B. C.,
Canada, July 12-15, pp. 397-408. |
| Azis, Iwan. J., |
1994 |
"Decentralization from the Regional
Perspective: An Application of AHP", Proceedings of the 3rd International
Symposium on The Analytic Hierarchy Process, Washington, DC,
365-378. |
| Azis, Iwan. J., |
1990 |
"Analytic Hierarchy Process in the Benefit
Cost Framework: A Post-evaluation of the Trans-Sumatra Highway Project",
European Journal of Operational Research, 48/1,
38-48.
|